Tully Gorge during the construction of the Tully River Hydro scheme
1950 - 1959
Archives
Find it!
Image looking down into the Tully Gorge during the construction of the Tully River Hydro-electric power scheme. Construction took place in the 1950s, with the Kareeya Power Station and the Koombooloomba Dam completing the major works
Title: 
Tully Gorge during the construction of the Tully River Hydro scheme
Date of work: 
1950 - 1959
Search dates: 
01 Jan 1950 - 31 Dec 1959
Level of description: 
Item
Type of materials: 
Graphic materials
Custodial history: 
Digitised from an original photograph held in the Dorothy Jones Library Heritage CollectionFrom the collection of Cardwell Shire Council
General notes: 
P04477
Places: 
Record types: 
Photographs
Record number: 
13265
