Tully Gorge during the construction of the Tully River Hydro scheme
1950 - 1959
Archives
Find it!
Image looking down into the Tully Gorge during the construction of the Tully River Hydro-electric power scheme. Construction took place in the 1950s, with the Kareeya Power Station and the Koombooloomba Dam completing the major works
Tully Gorge during the construction of the Tully River Hydro scheme
1950 - 1959
01 Jan 1950 - 31 Dec 1959
Item
Graphic materials
Digitised from an original photograph held in the Dorothy Jones Library Heritage CollectionFrom the collection of Cardwell Shire Council
P04477
Photographs
13265